ARBIS · Services

ARBIS services: HVAC design, supply, installation and service

Full cycle of ventilation, smoke control and air conditioning work — from calculation to maintenance.

Services

Full cycle: from concept to service

Concept → supply → installation → commissioning → tuning → maintenance

HVAC design

Load calculations, equipment selection, ventilation, smoke control and VRF schemes, specifications.

Equipment supply

VRF, split and multi-split, chillers, AHUs, fans, dampers — from stock and to order.

Ventilation installation

Supply and exhaust systems, heat recovery, ductwork on facades, in shafts and above ceilings.

Smoke control and pressurization

Smoke protection systems for residential complexes and car parks, КДМ-3 and КЛОП-1 dampers.

Air conditioning

VRF/VRV, light-commercial and residential split systems, multi-split, chiller-fan coil.

Commissioning and automation

Start-up, balancing, automation, sensors, integration with fire alarm and BMS.

Service and maintenance

Scheduled maintenance, diagnostics, refrigerant top-up, repair; cleaning of grill and oven hydrofilters.

Own production

Ducts, dampers, AHUs (КЦКП), hydrofilters, ГФ grills, NADIROFF AIR purifiers — NAD workshop.

Lightning protection and heating

Supply, installation and commissioning of lightning protection; eco° heat pumps, boilers and radiators.

03 · Guide

VRF system installation: 8 steps

Our team: design engineers, experienced site managers and certified installation crews. Complex routes — facades, shafts, heights: insulated ducts, fans and exhaust mains are assembled with the building's architecture in mind.

ARBIS crew work sequence. Exact lengths, height differences and pressures — per the manufacturer's manual for the specific model.

01
Calculation and selection

Heat gains per room, selection of indoor units and outdoor module, check of the connection ratio.

02
Piping and refnet layout

Pipe diameters, allowable lengths and height differences — per manufacturer tables; refnets from the brand's kit.

03
Indoor units and drainage

Suspension on threaded rods with vibration isolation, drainage with at least 1% slope, traps where needed.

04
Copper piping

Brazing with nitrogen purge, no scale; insulation of every pipe; supports at code-specified spacing.

05
Nitrogen pressure test

At the pressure specified by the manufacturer (for R410A usually 4.0 MPa), with holding time and record in the report.

06
Evacuation

With a two-stage pump to deep vacuum, hold check.

07
Refrigerant top-up

Amount — by length and diameter of liquid lines, weighed on scales.

08
Wiring, addressing, commissioning

Communication line between units, unit addressing, test run, report and staff training.

Questions about selection or installation?

An ARBIS engineer will reply in the messenger during working hours.

Address: Tashkent, Mirabad district, A. Fitrat St., 180V — entrance through the «VERANO» arch
Phone: +998 99 831 11 74 · Mon–Fri 08:00–18:00
Email: arbisklimatservis@gmail.com